Case Studies

Technician working on media replacement at a recycling plant

Media Redesign Restores Plant Capacity at Bakery

A recycling facility that processes waste bakery products experienced significant reductions in airflow capacity, negatively impacting production rates. The bottleneck was a two-chamber RTO (Regenerative Thermal Oxidizer) system that had prolonged startup times, suffered significant chamber temperature imbalances, and contained ineffective ceramic media.

RTO media change

Turnkey RTO Media Change Restores Performance for Can Manufacturer

A metal container manufacturer operating a 40,000 SCFM Regenerative Thermal Oxidizer (RTO) was facing serious operational challenges. High system pressure drop, temperature imbalances, and frequent media bake-outs were disrupting production and raising concerns about passing an upcoming air compliance test. Read how we delivered a turnkey solution—resolving system inefficiencies, restoring flow balance, and reducing downtime.

Field technicians changing RTO media in snow

Weathering the Storm: Ceramic Media Changes Post-Hurricane & in Sleet

Read how we successfully completed two different media changes and other RTO repairs in suddenly challenging conditions, on time and on budget.